Chena Floodgate/Army Corps of Engineers

Chena Floodgate/Army Corps of Engineers

Chena Floodgate/Army Corps of Engineers « back to all Projects Chena Floodgate/Army Corps of Engineers (North Pole, AK 2015) Alaska Crane provided the client added value by supplying fabricated dogging hardware, ultrasonic weld inspections, and performing the required...
Bristol Construction

Bristol Construction

Bristol Construction « back to all Projects Bristol Construction, U.S. Army Corps of Engineers-Alaska District (Ft. Richardson, AK 2014) Alaska Crane erected steel using a Kobelco CK1100/110T crawler crane with 110’ main boom and 30’ of jib and set a 100K+ multi-piece...
WesPac Logistics

WesPac Logistics

WesPac Logistics « back to all Projects WesPac Logistics: Pt. Mackenzie, AK 2014-2016 We’re providing heavy lift support and trucking utilizing cranes ranging from 90T – 250T and 35T forklifts throughout the barging seasons. ← Back to Featured...
Kodiak Fisheries Research Center

Kodiak Fisheries Research Center

Kodiak Fisheries Research Center « back to all Projects Kodiak Fisheries Research Center: Kodiak, AK 2013 We were awarded the task of steel erection, hoisting roofing materials, and air handling units as well as other mechanical construction components utilizing our...
Kodiak Fishmeal Company

Kodiak Fishmeal Company

Kodiak Fishmeal Company « back to all Projects Kodiak Fishmeal Company: Kodiak, AK 2013 Contracted us to hoist and place a #74,000lb boiler and a #120,000lb rotor to upgrade their fishmeal processing facility utilizing our Terex RT130 and DeMag 150T All-Terrain crane....